Stories
Who are the Marti Group? Find out in our stories – packed full of special insights and outlooks, sections and excerpts, snapshots, and intermediate steps.
Stories
Automatic climbing systemBallastless trackBIMBuilding and reconstructionBuilding constructionBuilding TechnologyCivil and structural engineeringCivil engineering and road constructionConstructionConstruction materialsConveyance technologyDigital BuildingDrillingsElectrical EngineeringEnvironmental engineeringExposed concreteFlood protectionFlooring technologyGotthardHistoryHydraulic engineeringInjections and WaterproofingMaintenance and RenovationMonorailPercent for artPlants and MachinesPortfolio analysis and RenovationProject DevelopmentRecyclingRenovationSpecial civil engineeringSpecial civil engineering and Hydraulic engineeringSustainabilityTechnologyTotal and General ContractorTotal servicesTowerTransport and Disposal logisticsTunnel-in-tunnel methodTunnel boring machineTunnel constructionUnderground structuresWater treatment
- 11.07.2025With its peak standing at over 3,000 metres above sea level, the Titlis is one of Switzerland’s most internationally renowned ...
- 16.12.2024A large part of Zurich’s city centre is situated on the alluvial cone of the Sihl river. Were the Sihl to break its banks, massive flood ...
- 31.07.2024Marti’s Ticino story continues with the construction of the second Gotthard road tunnel. This follows the building of the Ritom ...
Kategorie