Stories
Who are the Marti Group? Find out in our stories – packed full of special insights and outlooks, sections and excerpts, snapshots, and intermediate steps.
Stories
Automatic climbing systemBallastless trackBIMBuilding and reconstructionBuilding constructionBuilding TechnologyCivil and structural engineeringCivil engineering and road constructionConstructionConstruction materialsConveyance technologyDigital BuildingDrillingsElectrical EngineeringEnvironmental engineeringExposed concreteFlood protectionFlooring technologyGotthardHistoryHydraulic engineeringInjections and WaterproofingMaintenance and RenovationMonorailPercent for artPlants and MachinesPortfolio analysis and RenovationProject DevelopmentRecyclingRenovationSpecial civil engineeringSpecial civil engineering and Hydraulic engineeringSustainabilityTechnologyTotal and General ContractorTotal servicesTowerTransport and Disposal logisticsTunnel-in-tunnel methodTunnel boring machineTunnel constructionUnderground structuresWater treatment
- 30.06.2025A challenging refurbishment project on the N08. Built with respect for landscape and traffic. There are places where technology does not ...
Kategorie