Stories
Who are the Marti Group? Find out in our stories – packed full of special insights and outlooks, sections and excerpts, snapshots, and intermediate steps.
Stories
Automatic climbing systemBallastless trackBIMBuilding and reconstructionBuilding constructionBuilding TechnologyCivil and structural engineeringCivil engineering and road constructionConstructionConstruction materialsConveyance technologyDigital BuildingDrillingsElectrical EngineeringEnvironmental engineeringExposed concreteFlood protectionFlooring technologyGotthardHistoryHydraulic engineeringInjections and WaterproofingMaintenance and RenovationMonorailPercent for artPlants and MachinesPortfolio analysis and RenovationProject DevelopmentRecyclingRenovationSpecial civil engineeringSpecial civil engineering and Hydraulic engineeringSustainabilityTechnologyTotal and General ContractorTotal servicesTowerTransport and Disposal logisticsTunnel-in-tunnel methodTunnel boring machineTunnel constructionUnderground structuresWater treatment
- 31.07.2024Marti’s Ticino story continues with the construction of the second Gotthard road tunnel. This follows the building of the Ritom ...
- 24.07.2024The ewz-Herdern project aims to renovate, expand, and modernize the main building of ewz (Electricity Works of the City of Zurich) to meet ...
- 04.08.2022A new urban quarter is planned for the site of the former Sandrain gasworks in Bern. The level of soil pollution clearly reflects the ...
Kategorie