Stories
Who are the Marti Group? Find out in our stories – packed full of special insights and outlooks, sections and excerpts, snapshots, and intermediate steps.
Stories
Automatic climbing systemBallastless trackBIMBuilding and reconstructionBuilding constructionBuilding TechnologyCivil and structural engineeringCivil engineering and road constructionConstructionConstruction materialsConveyance technologyDigital BuildingDrillingsElectrical EngineeringEnvironmental engineeringExposed concreteFlood protectionFlooring technologyGotthardHistoryHydraulic engineeringInjections and WaterproofingMaintenance and RenovationMonorailPercent for artPlants and MachinesPortfolio analysis and RenovationProject DevelopmentRecyclingRenovationSpecial civil engineeringSpecial civil engineering and Hydraulic engineeringSustainabilityTechnologyTotal and General ContractorTotal servicesTowerTransport and Disposal logisticsTunnel-in-tunnel methodTunnel boring machineTunnel constructionUnderground structuresWater treatment
- 17.03.2023In the past, the Sarner Aa Valley in Obwalden has increasingly been the victim of severe weather events. Therefore, to protect against ...
- 15.02.2023The second Gotthard road tube will be constructed over the next few years. Since the beginning of 2021, the Marti Group has been hard at ...
- 05.12.2022Saint Barbara is the patron saint of miners. The celebration of Barbara takes place on 4 December, her name day, at underground mines ...
- 10.06.2022The official green light for excavation of the Gotthard South access tunnel (lot 343) took place with a special ceremony in Airolo on June ...
Kategorie