Stories
Who are the Marti Group? Find out in our stories – packed full of special insights and outlooks, sections and excerpts, snapshots, and intermediate steps.
Stories
Automatic climbing systemBallastless trackBuilding and reconstructionBuilding constructionCivil and structural engineeringCivil engineering and road constructionDrillingsFlooring technologyHydraulic engineeringInjections and WaterproofingSpecial civil engineeringSpecial civil engineering and Hydraulic engineeringTowerTunnel-in-tunnel methodTunnel boring machineTunnel constructionUnderground structures
- 30.08.2023ARGE Marti LBST has been working in the Lötschberg summit tunnel since 2018, replacing the existing ballasted track with a slab track. The ...
Kategorie