Renovation and widening of the Petersberg Tunnel
Renovation and widening of the Petersberg Tunnel
Neef, Germany
The Petersberg Tunnel in Germany no longer complied with modern requirements. This is why Deutsche Bundesbahn commissioned us with its renovation. Both the demolition of the old tunnel and the construction of the new tunnel needed to be carried out while the tunnel was still in service, i. e. under live overhead contact line systems. Marti significantly expanded the scope of tunnel rehabilitation with its specially developed tunnel-in-tunnel method.
Client | Deutsche Bahn AG |
Execution | Marti Tunnel AG |
Construction period | 2017 – 2020 |
images
Facts & FIgures
CONSTRUCTION LENGTH
000
mREINFORCEMENT DRIVING, INNER LINING, AND PORTALS
0000
tROCK BOLTS IN TUNNEL
0000
unitsPRECUT REINFORCEMENT NORTH/SOUTH AND RETAINING WALLS NORTH
00
tCONCRETE AND INJECTION VOLUME NORTH/SOUTH PRECUTS AND NORTH RETAINING WALLS
000
m³TUNNEL EXCAVATION VOLUME
00000
m³CONCRETE AND SHOTCRETE VOLUME IN TUNNEL
00000
m³SELF-DRILLING ANCHORS IN TUNNEL
0000
unitsEXCAVATION AND EXCAVATION VOLUME PRECUTS NORTH/SOUTH AND RETAINING WALLS NORTH
0000
m³NORTH/SOUTH ROCK ANCHOR PRECUTS AND NORTH RETAINING WALLS
0000
units