Linth-Limmern pumped-storage plant
Linth-Limmern pumped-storage plant

Linth-Limmern pumped-storage plant

Linthal, Switzerland

Kraftwerke Linth-Limmern AG (KLL) has ex­panded its existing hydro­power station with the con­struc€tion of an under­ground pumped-storage plant between the Limmern and Muttsee lakes. Marti played a leading role in the project during the con­struc­tion period from 2009 to 2016. One particular challenge was the high alpine con­struc­tion site, which was only accessible via con­struc­tion rope­ways and required certain logistical feats.

Client

Kraftwerke Linth-Limmern AG KLL

Execution

Marti Tunnel AG
Marti AG, Bauunternehmung, Zürich
Marti Technik AG
Marti AG Bern

Construction period

2009 – 2016

images

Facts & Figures

special features

  • Management from the valley only via construction ropeways
  • Two concrete plants underground and one at Lake Muttsee
  • Working height between 817 and 2,446 m above sea level
Concrete
00
HEIGHT OF RETAINING WALL
00
m
LENGTH OF RETAINING WALL
00
m
Diameter tunnel boring machine
00
m

additional information

More projects

Datenschutzhinweis

Diese Webseite nutzt Webanalyse-Tools von Dritten, um die Nutzung der Website zu analysieren und den Erfolg von Werbekampagnen zu messen, sowie externe Komponenten wie Google Maps. Dazu werden Cookie gespeichert. Die notwendigen Cookies führen zu keiner Datenübermittlung und können nicht abgewählt werden.
Mit einer Erlaubnis der Verwendung von Analyse-/Marketing Cookies und externen Komponenten ist mitunter eine allfällige Übermittlung von Daten in die USA verbunden. Details anzeigen

Sie können Ihre Auswahl jederzeit unter Datenschutzinformationen widerrufen oder anpassen.