Linth-Limmern pumped-storage plant
Linth-Limmern pumped-storage plant

Linth-Limmern pumped-storage plant

Linthal, Switzerland

Kraftwerke Linth-Limmern AG (KLL) has ex­panded its existing hydro­power station with the con­struc€tion of an under­ground pumped-storage plant between the Limmern and Muttsee lakes. Marti played a leading role in the project during the con­struc­tion period from 2009 to 2016. One particular challenge was the high alpine con­struc­tion site, which was only accessible via con­struc­tion rope­ways and required certain logistical feats.

Client

Kraftwerke Linth-Limmern AG KLL

Execution

Marti Tunnel AG
Marti AG, Bauunternehmung, Zürich
Marti Technik AG
Marti AG Bern

Construction period

2009 – 2016

images

Facts & Figures

special features

  • Management from the valley only via construction ropeways
  • Two concrete plants underground and one at Lake Muttsee
  • Working height between 817 and 2,446 m above sea level